
Juni 2017: Backen in Nice View
19. June 2017Juli 2017: Kilometer for Afrika
2. July 2017As a result of the heavy rain in recent times our roofs were strongly affected and several had to be repaired.
The roof of the large school building had to be completely renewed on one side and also in the girls’ house, several of the plastic sheets were replaced. In addition, it was necessary to replace the part of the hospital roof, where the solar system is located and to patch a few posts in the main building.
A few pictures…
Your team of Projekt Schwarz-Weiß e.V.
1



